7/27/2023 0 Comments Crane ordinary lift plan templateHave an approved Critical Lift Plan on site prior to the lift. Only allow work from, or transport by, a crane suspended personnel platform when conventional means of performing the work or reaching the work site would be more hazardous, or is not practical, because of structural design or work site conditions. Have a separate, approved Critical Lift Plan on site prior to the lift, each time one of these types of lifts is performed. Utilize cranes of same size, manufacturer, and model, if possible, (except tailing lift) for tandem (multiple), and turning lifts. Tailing lifts, tandem (multiple cranes), or turning lifts:ĭe-rate all cranes involved in the lift by 25% of the load chart.